Nationwide Children’s Hospital CEP

Client: Nationwide Children’s Hospital

Location: Columbus, Ohio

  • Electrical budget: $14M+ with pre-purchased equipment
  • GMP: $6.45M
  • Design Assist
  • Value Engineering Savings = $450,000
  • (4) 3 MW Gensets
  • Replacement energy plant for entire campus

The Nationwide Children’s Hospital Central Energy Plant is the power center for the existing and replacement hospital. It serves as the main chiller and boiler plant for the hospital campus. This complex project was awarded to The Superior Group under a design assist contract, and we have been able to generate significant value in pre-construction value analysis, field research, and planning. The project showcases our firm’s ability to manage critical power systems and complex phasing requirements as we ready a new energy plant while maintaining permanent power in an operating hospital environment.

SERVICES: BIM, Construction, Pre-Con

MARKETS: Healthcare